Click on the images below to see a larger version. 26th September to 2nd October 2005
Plasterers back in and this week saw the remaining rooms and some of the
landings finished on the top floor. It really does make a big difference the place does almost look like a house!
Whilst Steve and Rich were doing their thing we were down in the basement covering the insulated
false walls with a vapour barrier and then plasterboard. Hopefully having run the necessary cables behind them.....
There should have also been a bit more progress on the drains but machine breakdowns put the
dampers on that.
Hopefully next week we'll start on the heat pump pipes - 165m of trench in the fields..1.8m deep.... plenty of scope for fun even without the possibility of rain!! Someone tell me why am I doing
this??