Click on the images below to see a larger version. 23rd to 29th January 2006
A lot done but some frustrations...
Nearly all of the plumbing in the
basement is done and ready for flushing, we've also installed a rad to act as a heat dump for the solar loop should the thermal store reach the high temp limit. We also put in the expansion vessels for the sealed
loops.
As well as this we also got the ventilation unit plumbed in and up and running - very nice to have some fresh air!!
Still more work on the electrics with power being connected to the house next week.
The
frustrations were down to Welsh Water messing about with the connection - a domestic sprinkler system seems to be too far from the normal for anything to work at first attempt. Not having faith in their estimates
for connection meant I had to put off the heat pump commissioning until I was sure we woul have water...... Monday/Tuesday have been mentioned but let's see.....